Information

By

This is the third layout and the third location since 1995.  This layout was started six years ago.

The buildings and bridges are all scratch built.  Most of the locomotives and cars have been weathered.  The trains run on battery power on five separate loops or can be run on the entire loop.

Ron

rsenek@gmail.com

775 934 8497